New Power Schedule (Time Table) For Kashmir Valley – Check Here
Srinagar: With the improvement in weather conditions in the Valley, the Kashmir Power Distribution Corporation Limited (KPDCL) is mulling to announce revised and new power schedule in Kashmir Valley after March 01.
Chief Engineer, Aijaz Ahmad Dar, said that there is no change in the power schedule as of now. However, he said that the revised schedule will be announced after March 01.
It is pertinent to mention here that there are frequent power cuts in Kashmir valley during the winter that becomes a cause of irritation among the masses.
Tags
JAMMU KASHMIR